【Power Outage Notice】 Annual maintenance for high-voltage electrical equipment

Power Outage Notice

Annual maintenance for high-voltage electrical equipment

Construction Date: August 3rd, 2025 (Sunday)

Construction Time: From 06:00 AM to 05:00 PM (The power will be restored as soon as the work is completed.)

Contact person of the General Affairs Office: Mr. Yang 3366-9831#27(3366-3366#27111)

Power Distribution Room: 3366-2224; 0911-769-831

Contact person of the construction unit: Mr. Huang 0910-228-381

《Notice

  1. Please install surge absorbers for sensitive electronic devices or turn them off before the power outage. Delay the time for turning on the power after restoration to ensure the safety of electrical equipment.
  2. Please turn off the power of electrical equipment in laboratories and the Instrument Center before the power outage, or unplug them from the sockets to prevent voltage and current damage to the devices when power is restored.
  3. If the government announces office closures due to typhoon condition, the construction will be rescheduled accordingly. If work is not suspended, it will proceed as scheduled. However, if an on-site assessment reveals that the operations may be affected due to the weather, they will be rescheduled for safety factor.
  4. Please adjust the laboratory experiment schedules to avoid working during the power outage period. If it is absolutely necessary to work during that time, please make sure to prepare alternative power sources in advance.
  5. The elevator will be powered off and temporarily suspended from 4:30 PM on August 1st (Friday) until 8:30 AM on August 4th (Monday) to prevent possible accidents due to power outage.